Preliminary preparation
Color design
In winter, home design, people tend to warm colors in the choice of color. However, it should be noted that it is best not to choose too warm colors in the design, especially in the south-facing room, if the whole room is too warm, it will feel hot in the summer. It is also more troublesome to change colors later. Even if you choose a warm color in the north facing room, you need to have proper adjustments.
Schedule
The Spring Festival is the time for the decoration workers to return home, so it is necessary to pay attention to the reasonable arrangement of the time in the winter decoration. It is best to start before the Spring Festival or after the Spring Festival. Because during the Spring Festival, sometimes many skilled workers will go home, some unprofessional Workers instead of construction, it is inevitable that work is rough.
Temperature condition
For newly built houses, the walls and floors are usually damp and cold. It is easy to cause the tiles to be weak or have adverse effects on the solid wood flooring. Therefore, it is necessary to renovate the room after heating for a period of time to help the walls and the ground dry quickly. In winter, the indoor temperature should be above 5 °C and the ventilation should be moderate. Chemical products should not be placed on the balcony on the north side, otherwise it will be frozen.
Material preparation
Wood: Winter decoration, the impact on wood is mainly in terms of temperature and humidity. Too low or too high a temperature can cause the wood to curl or even crack. Therefore, the wood used in the decoration should be prepared in advance, preferably placed in a heating room for three to five days, so that the moisture content of the wood is close to the level inside the house. In addition, the timber should be kept away from the ventilated area after it has been transported to the renovation site.
Veneer: After the veneer enters the decoration site, it should be dusted in time and immediately brushed the varnish to prevent air drying. The decorative panel should be placed flat, moisture-proof and anti-cracking and anti-lifting. For families with floor heating, the wooden keel should be insulated on the ground, then the veneer should be placed neatly, and then a thick plate should be placed on it.
Wall bricks and floor tiles: Regardless of wall tiles or floor tiles, materials should be moved to the indoor storage stage to make them consistent with the indoor temperature before construction to avoid the phenomenon of empty drums and falling off.
In the winter decoration, when laying solid wood flooring, at least 1 cm of expansion joints should be left at the edge of the wall to avoid thermal expansion in summer.
Under construction
Tile off
In order to prevent the tiles from falling off, after the tiles are transported indoors, they must be placed on the site for 24 hours, so that the tiles and the indoor temperature are consistent before starting construction.
Before the paving, the tiles should be treated with water, and the water must be saturated. Only in this way, when bonding, the cement does not adhere to the cement due to the suction of the tile, and the phenomenon of emptying and falling off occurs.
At the same time, in the dry indoor construction, it is necessary to sprinkle water on the wall first, so that the wall surface is relatively moist, and then paste, so that the wall surface and the cement mortar are firmly matched.
Tip: When the heating is removed indoors, the temperature of the balcony is not enough. If the tile is attached, it will easily fall off. Therefore, when dismantling the heating, it is best not to lay the balcony tiles.
Wood deformation
When the winter is being renovated, the seams of the doors and windows should not be too small, so as to avoid the summer heat expansion and tightness. When the wooden door is installed, the thickness of the paint on both sides of the wooden door is different, and the tension on both sides is also different, so that the wooden door is deformed. Therefore, it is necessary to leave some gaps at the wall to make the wooden door have a contraction space. When laying solid wood flooring, at least 1 cm of expansion joints should be left at the edge of the wall. When making furniture, you need to leave a seam of about 0.1 mm.
The wood in winter is easy to be brittle, and it may not be visible at the beginning of cracking. However, if the painter does not work in time, it is easy to crack the veneer on the surface of the veneer. For the wood line used as the edge, the moisture content is higher than that of the veneer. After the processing is completed, the surface should be sealed as soon as possible, otherwise the shrinkage will occur and the appearance of the veneer will be affected.
Tip: Prevent fires, avoid construction workers from staying at the scene, and clean up flammable materials such as wood chips and wood chips at any time.
Paint cracking
Winter wall paint and paint are easy to crack and warp, the main reason is that the indoor and outdoor air convection is large, and the wall paint or the paint on the bottom of the paint does not dry out, the top coat is easy to "sweating" or even a large area. Cracking.
Therefore, when applying latex paint or paint, the window ventilation time is best chosen between 10 am and 4 pm, the south window can be opened larger, and the north side is opened smaller to prevent the new batch of putty from freezing. After the putty is completely dry, give it a second time. The time between painting should be longer, at least after 4 hours of interval. In the case of latex paint, the interval may reach 8 hours.
In case of windy weather, it is not advisable to carry out the oil work industry because the wind and sand in winter is large, and the dust is easy to adhere when the paint and paint are not dry. The ambient temperature at which the paint is applied is not less than 5 degrees Celsius, and the temperature at which the varnish is applied is not less than 8 degrees Celsius.
How much to adjust the wall and top paint, the first day of the adjusted paint is not used up, the next day is best not to use, because the indoor air is dry, the water loss is faster. The putty before the oil workers can't be too thick, otherwise it will easily cause empty drums, cracks and wall inequality.
Tip: The dry crack on the wall in the winter is mainly caused by uneven water loss. Sticking kraft paper or beancloth on the wall can play a certain preventive effect.
Ceiling crack
Wind, dryness and cold are the causes of cracking of the wooden keel ceiling. Therefore, in the construction, try to avoid the ceiling of the wooden keel structure, it is best to use the light steel keel ceiling. If wood keel is used, its water content must be controlled below 12%. For cracks due to different cold shrinkage coefficients of different materials, the construction personnel should adopt a method of reserved seams, such as all wood products joints controlled at 1 mm. The joints of gypsum board and cement board are controlled at 8 mm. A gap of about 0.5 cm is left between the gypsum board and the joint between the gypsum board and the wall surface. The gypsum powder and the latex are used to adjust the caulking, and then the kraft paper is attached, and the putty is added to prevent the plaster line. Cracking.
Tip: The construction site should always spray some water to maintain proper humidity.
After completion
Acceptance quality
During the inspection, it is important to check whether the seams, stickers and patchwork in the construction meet the requirements, and the decoration company agrees on the details of the after-sales warranty. When inspecting the wall tiles, use a metal hammer to gently tap the four corners and the middle of the wall tiles. There should be no sound of holes, the walls and tiles are tightly stitched, and the entire plane should be flat. Check the floor for obvious gaps and unevenness, and whether the floor and the skirting board joint are tight.
Tip: After the completion of the work, we must carefully check and accept, to avoid disputes in the future.
After the winter decoration, the indoor air test should be carried out, because in the heating season, the volatile substances such as formaldehyde and benzene in the decoration materials such as the large core board have a large amount of volatilization.
Detecting air
Pay attention to the detection of indoor air. Because the olfactory organs of the people are slow in the winter, the smell is not great after the decoration. In addition, indoor harmful gases such as carbon dioxide, carbon monoxide, benzene and radioactive materials are not perceptible. In the heating season, the air is dry, the temperature is high, the indoor ventilation is poor, and the harmful substances such as formaldehyde and benzene in the decoration materials such as the large core board and the wooden floor are large in volatilization, and the concentration of harmful substances is likely to exceed the standard.
A qualified indoor air testing department should be asked to do an air test. If it is unqualified, immediately ask the experts to find out the source of the harmful substances and ask the workers to rework to prevent hidden dangers. After the test, listen to the expert's opinion and choose the appropriate check-in time. It is recommended to raise more green plants indoors, so that flowers and water absorb some harmful gases.
Tip: People must close the window when they walk, otherwise the heating will be damaged.
Window ventilation
After the renovation, the owner can put a basin of water in each room to increase the indoor humidity and prevent the walls, tops, furniture and other dry and cracked too quickly. Although the ventilation of the window is beneficial to dispel the harmful substances such as formaldehyde and the drying of the paint, the outdoor temperature in the winter is low, which will deteriorate the latex paint, and the adhesion is deteriorated or even powdered. The wall surface of the latex paint that has not dried up after the decoration is easy to be frozen, and the wall surface is easily discolored after the spring. Ventilation is necessary. It is best to choose a warm afternoon, and the ventilation time should not be too long to prevent the wall near the window sill from being discolored.
Characteristics and Advantages
(1) Intelligent control design: adjustable main parameter and secondary parameter automatically according to the weight of door leaves;
(2) Low noise: Special static sound track, integration of motor, worm-gear and retarder.
(3) Anti-clamping function: automatically reverse when meeting barriers;
(4) Unique electronic motor lock: the motor will lock up when the door is forced to open.(controlled by remote or switch)
(5) Tighten force: seal door when closed, power consumption approximately 10W under standby;
(6) Advanced brushless motor(36V,100W) can automatically adopt different heavy door leaves;
(7) Bi-doors inter-locking: one of the door leaves always remains closing;
(8)Safety sensor terminal: sensor stops working when door closed;
(9)Unique coating technology: never rusty;
(10)Easy and convenient to install;
(11)Working Process: when the door leaf closes to the right place, the door leaf will slightly shift to the door frame and the ground. The rubbers on the four sides of the door leaf will completely combine with door frame and ground, which ensures air tightness. When the door is open, the rubbers will separate from door frame and ground, which avoids contraction on the ground.
Technical Specification
Specification |
Light Duty |
Heavy Duty |
||
Rang of the Door |
Single-Leaf |
Double-Leaf |
Single-Leaf |
Double-Leaf |
Door leaf max weight |
100kg |
100kg x 2 |
200kg |
200kg x 2 |
Mounting Method |
Surface mounting or built-in mounting |
|||
Open Width |
700-2000mm |
650-2000mm |
750-2000mm |
650-2000mm |
Power Supply |
AC 220v ± 10%, 50-60 Hz |
|||
Opening Speed |
300-500mm/s (adjustable) |
|||
Closing Speed |
250-550mm/s (adjustable) |
|||
Creep speed |
30-100mm/s (adjustable) |
|||
Hold-open time |
0.5-20s (adjustable) |
|||
Airproof Force (Max.) |
>70N |
|||
Manual Pushing Force |
<100N |
|||
Electronic Lock Force |
>800N |
|||
Power consumption |
150W |
|||
Ambient temperature |
-20+50 C |
Technical Details:
(1) Rubber lining sealing technology combined with V groove on the guide rail enables the door completely sealed when the door closed;
(2)Special door body location technology. Semicircular surface beam on the ground matches with the V style groove at the bottom of door leaf, which stop the door from swing and make sure it moves stable and smooth;
(3) The door body decorated with matte stainless steel or spray surface, and on the middle and both sides with sealing stripes to ensure the hermetic effect.
(4)Feet sensor switch applied to avoid contagion;
Stainless Steel Sliding Door,Stainless Steel Bypass Sliding Door,Stainless Steel Interior Sliding Door,Stainless Steel Folding Sliding Door
Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hfgaragedoor.com