The five main points of home decoration and hydropower installation

The hydropower reform is divided into waterway reconstruction and circuit transformation. In the new house installation process, the water circuits must be installed. Otherwise, problems will arise in the future. Hydroelectric installation is a covert project for home improvement. Many details are easily overlooked and not easy to check. So when it comes to renovations, it's a good thing to do. The following Xiao Bian will share with you the five main points of the house decoration water and electricity installation , want to know then continue to read it!

House decoration hydropower installation points I. Kitchen waterway reconstruction

The waterway reconstruction of the kitchen mainly includes faucets and water heaters. The average family is a kitchen and bathroom shared a water heater, so when the waterway reform must be a good place to install the water heater, to determine the location of the hot and cold water pipe installation, waterway reconstruction .

House decoration hydropower installation points Second, the bathroom waterway transformation

The content of the transformation of the bathroom waterway is relatively high. The installation positions of the wash basin, toilet, bathtub and washing machine, and the need for hot water pipes must be well thought out. The drains of the drains must be handled in place, otherwise the backwater phenomenon will be caused later. Water meter installation position should be convenient for reading, water meters, valves from the wall to the appropriate distance, to facilitate the use and maintenance. The water inlet of the toilet bowl should be placed where it can be blocked by the toilet. One-piece toilets should be based on the model to determine the location of the outlet, generally left in the center of the toilet outlet 200 mm left.

House decoration water and electricity installation points three, the transformation of the living room circuit

The wiring lines that need to be installed in the living room include power lines, lighting lines, air conditioning lines, television lines, telephone lines, computer lines, and doorbell lines. The position of the wire needs to be considered in advance, and the reserved work is done. Generally speaking, it is necessary to leave a telephone line at the edge of the sofa, and to leave a doorbell line at the inside of the door. The water dispenser, humidifier and other devices are reserved for power. In general, living rooms should have at least five power cords. Air-conditioners, DVD players, and other devices that are not in the standby state are best equipped with switch socket panels so that they can be switched off when not in use and will not waste electricity.

House decoration hydropower installation points four, bedroom circuit renovation

The bedroom circuit transformation includes power lines, lighting lines, air conditioning lines, telephone lines and computer lines. Reserve a power cord at the top of the bedside table and use a 5-hole patch panel with a switch, which can reduce the trouble of not switching on the bedside light. Above the dresser should be reserved for power wiring, easy to use the hair dryer, in addition to considering there should be reflector lamp above the mirror, can be installed next to the box next to a switch, the bedroom lamp is best to use double switch, one installed outside the bedroom door Another switch is installed on the upper side of the bedside table or at the edge of the bed where it is easy to operate, so that at night, you do not need to get up and go to the bedroom door to turn off the lights.

House decoration water and electricity installation points five, kitchen bathroom circuit renovation

There are many electrical appliances used in the kitchen. Therefore, when the circuit is reformed, it is necessary to determine which electrical appliances are needed in the kitchen, where the display is placed, and then set aside the wire interface. It will not cause inconvenience to themselves in the future. . The circuit transformation of the bathroom can only be reserved for the overall lighting circuit.

Editor's summary: The above is the relevant content of hydropower installation for house decoration . As long as you consider these items in advance, and strictly supervise the workers to follow the standard procedures during construction, hydropower reform generally does not have problems. After the waterway reconstruction, Pay attention to the waterproof test to avoid leakage problems. For more water and electricity installations or related content, please pay attention to this site, or you can visit this site under the line of experience directly.

Hydropower installation hydropower reform

Waste Steel Weighing Scale

It uses double platform structure and semi-pit installation, and efficient buffer components are used, which can absorb impact energy of waste steel during weighing, and reduce impact force born by Load Cell.

It can be widely used for weighing steel ladle and iron ladle in steel plant and casting plant

Double platform structure design, thick plate, efficient buffer components, strong impact resistance;

Buffer components absorb impact energy, and improve operating life of load cell;

Buffer components are optional, and high temperature configurations are optional;

Buffer components use suitable pre-tightening force, and reduce weighing stabilization time;

Scale frame has excellent structure, rational limit, quick and reliable weighing.

Customizing according to user`s steel ladle specifications.

Stainless Steel Weight Scale,Weighing Scale For Waste Steel,Scale For Weighing Waste Steel,Waste Steel Weighing Scale

SHANDONG JINZHONG SCIENCE & TECHNOLOGY GROUP COMPANY LIMITED , https://www.chinagoldbell.com