The bathroom space is part of the home improvement space, with the most emphasis on waterproofing. The space in the bathroom is relatively small, but there are many fittings involved, especially the laying of waterways and pipes, etc., which require special attention. Then, how to check the bathroom floor decoration? What is the standard at the time of acceptance?
The bathroom space is mainly used for daily washing work. The environment is usually damp and dark, so it is necessary to pay attention to waterproof and non-slip. In addition, the interior decoration of the bathroom mainly needs to use waterproof materials, such as ceramic tiles, to extend the service life. Today, Xiaobian wants to share with you how to accept the bathroom floor decoration? The acceptance criteria of the bathroom floor. Let’s take a look!
First, how to accept the bathroom floor decoration - bathroom floor acceptance specifications
How to do the bathroom floor acceptance? First, let's take a look at the acceptance criteria for the bathroom floor tiles. Because the main focus of the bathroom space is waterproof, it is especially necessary to pay attention to whether the waterproof function is in place during the acceptance of the bathroom floor. In the general bathroom renovation process, a closed water test will be carried out, but after completion, all the toilets will still need to be checked one by one. In addition, every step of the toilet floor in the basic treatment, hole cleaning and sealing, screed construction, filling and sealing grease, and additional layers of the bathroom must be checked and confirmed by the engineer before recording can begin. The painting of the layer also needs to be checked by the engineer before the next layer can be applied.
After the waterproof layer is dried, quality inspection and acceptance are still required. The acceptance items include whether the waterproof layer coating is full, whether the thickness is uniform, whether it is tightly closed, and the surface should not be drum, crack, or warped. The waterproof and closed water experiment of the bathroom should ensure that there is no water seepage or wetting under the floor of the bathroom and around the pipe, otherwise it will need to be reworked. Moreover, the second floor water test is required after the design of the bathroom floor, and the experimental project requirements are the same as the first time.
Second, how to check the bathroom floor decoration - bathroom floor acceptance considerations
How to do the bathroom floor acceptance? Next we have to look at the precautions for the bathroom floor acceptance. It should be ensured that the original waterproof layer of the bathroom floor is damaged. The waterproof layer is easily damaged during the re-decoration process and should be repaired in time, otherwise leakage will affect the quality of life. Also, it should be determined whether the floor waterproofing work is done when the bathroom floor tiles are laid. In the process of renovation of the bathroom, if the original floor tiles need to be replaced, the cement mortar must be leveled first, and then waterproofed, so that leakage due to uneven thickness of the waterproof coating can be placed. And before the waterproof work, be sure to clean the ground, use polyurethane waterproof coating to repeatedly paint, and then add the original waterproof layer, together form a composite waterproof layer, waterproof effect is better.
Third, how to check the bathroom floor decoration - bathroom ground acceptance requirements
How to do the toilet floor acceptance? Finally, let's take a look at the engineering acceptance requirements for the bathroom floor. Polyurethane waterproof coating is used in the waterproof treatment of the bathroom floor. This kind of coating needs to have the factory certificate, and it must pass the sampling and re-inspection to meet the design requirements and meet the relevant technical specifications. There must be no leakage. In addition, the base layer of the polyurethane waterproof layer should be firm, flat and clean, without sanding and loosening, and the yin and yang corners should be arc-shaped or obtuse. Moreover, the polyurethane waterproof coating should be firmly bonded, tightly combined, and uniform in thickness.
The above is how to check the bathroom floor decoration? The bathroom floor acceptance criteria are shared. This includes the specification of the toilet floor acceptance, the precautions for acceptance, and the acceptance requirements. It can be seen that although the bathroom space is small, the decoration acceptance is still not sloppy. Is your bathroom's acceptance qualified?
CZL-YB type (made of alloy steel) column Load Cell is hermetically sealed,and has protection grade specified as IP68.IP69K. It has high ability to correct the center. Argon-arc welded, taking compression force, its dynamic reaction is good. Easily installed. It is able to be used in explosive dangerous circumstance, the explosion-proof symbol is Exia â…¡ CT6Ga;ExiaD20T85. It can be highly over-loaded and used in Truck Scale, dynamic railway scale, Hopper Scale and so on.
Compression Load Cell,Column Load Cell,Column Type Load Cell,Compression Type Load Cell
SHANDONG JINZHONG SCIENCE & TECHNOLOGY GROUP COMPANY LIMITED , https://www.chinagoldbell.com