I want to tell you something seriously: the order of house decoration is wrong, it is easy to fall forever!
Things started to talk about from my buddy. This guy recently got mad and the gas water heater came to the door, only to find that the ceiling was already installed.
What happens?
You can only knock off the corner of the waterproof gypsum ceiling, connect the water heater, and then call the master to make up.
It's been three years since the seam was sewed and repaired. It is estimated that you can imagine the current picture of the kitchen ceiling. Just like the original imported mobile phone was disassembled and assembled again, can you feel comfortable?

Then, when I delve into it, do n’t say that there are really many people who make such low-level mistakes, and I regret it ...
"I haven't completely determined the furniture, so I hurriedly renovated it. What experience? I just wanted to beat myself up, and I was tired ..."
"If I didn't disdain the order of decoration, wouldn't I be so miserable. I would like to advise you to come in order and walk step by step."
The decoration is really a history of blood and tears with remorse, step by step. Straightforward, I am here to tell you the correct order of decoration, the content is a bit dry .... goods. After reading it quietly, it is a real use!

House renovation order
The rough classification is the following four categories
Design section
↓
Construction part
↓
Installation part
↓
Ending part
The more detailed classification is the following sequence table
Early design
↓
Main body dismantling
↓
Floor heating measurement
↓
Hydropower renovation
↓
Floor heating
↓
Woodworking
↓
Packing pipes, leveling, tiling
↓
Door and cabinet measurement
↓
Wall paint, paint
↓
Water heater installation
↓
Ceiling installation
↓
Cabinet installation
↓
Range hood installation
↓
Indoor door installation
↓
Floor installation (wallpaper)
↓
Socket installation
↓
Fixture installation
↓
Hardware and sanitary ware installation
↓
Installation of mirrors, faucets, drying racks, curtain rods
↓
Wasteland cleaning
↓
Furniture, home appliances
↓
Bedding and decoration
That ’s right, it ’s that long—
In addition, the procurement of decoration materials is also carried out in steps. Considering in stages is more conducive to us to focus on this part of the product at the appropriate stage without spending the wrong money.
Then, the purchase of materials is basically divided into:
Before decoration → After construction → During installation → After installation
In more detail, it is the following:
Before starting work
These things can be prepared in advance by yourself, or you can ask the decoration team to buy it on your behalf. Although we all know that the decoration team is clearly going to earn material costs, in order to allow the masters to work more at ease, it may be appropriate to "release water".
However, the brand still needs to be settled and cannot be overcharged. You also need to set a bottom line for yourself. Once the bottom line is exceeded, other materials would rather be purchased by yourself.
1. Security door. The standard type arrives in 3 days, customized for more than one week.
2. Pipe and wire. No reservation is required and it is available at any time.
3. Cement, sand, putty. No reservation is required and it is available at any time.
4. Sandpaper, putty, white latex. Auxiliary materials for woodwork painters, no need to book, in place at any time.
5. Seal balcony windows. The wall must be measured and installed early in the transformation. To seal well, the sound insulation should also check the certificate, date of manufacture and specifications, etc.
6. Cabinets, bathroom cabinets. At the initial stage of wall reconstruction, the size should be measured, a plan should be formulated, and the production cycle is generally more than one month.
7. Sink and stone. At the beginning of the wall reconstruction, the size should be measured and matched with the cabinets and bathroom cabinets; the stone is scheduled to take 3-7 days to prepare for the bricklayers behind.

Construction began
Although the following is all about construction, there is also a demarcation point here, which is hydropower transformation. You need to know that in fact, many materials and furniture are linked to the location and size of water and electricity.
1. The central water processor (when hydropower starts) considers the cabinet design method and hydropower design plan
2. Central air conditioning (simultaneous hydropower) consideration of hydropower design
3. Gas water heater. (When kitchen hydropower is renovated) Consider the cabinet design method and hydropower design plan
4. Bathtub and shower room. (When the toilet hydropower is transformed) consider the hydropower design plan
5. Consider the cabinet design method and water and electricity design plan for range hoods and stoves
6. Order the size of the tiles and floor tiles (when the kitchen and bathroom are renovated in water and electricity), it is better to buy more, rather than make up in batches, each batch of tiles will be slightly different
7. TV, refrigerator, washing machine. Start to understand the model, determine the size, and consider the hydropower design plan.
8, bedroom wall lights, chandeliers. If you also need to install wall lamps and chandeliers at the head of the bed, please also look at the style, determine the location, and consider the hydropower design plan.

And after hydropower, it is "wamu oil", at this time there are many materials needed:
1. Waterproof material. No reservation required, available at any time
2. Jointing and beauty agent. It takes about a week for the ceramic tile to be scheduled, so I said earlier that the water and electric working hours can be reserved. No need to make reservations for the US sewing agent and the sewing agent
3. Floor drain. Install when the bricklayer lays the tiles, buy in advance
4. Order ceiling (keel, gypsum board). Bricklayers can make reservations when they enter the venue, starting 3-5 days after the bricklayer finishes laying the tiles
5. When the decoration of the cloakroom (before the carpenter enters the venue) is initially completed, the cycle generally takes 14 days
6. Plates, nails and other accessories (before carpenter enters the site) do not need to book, they are available at any time
7. Latex paint (before oil workers enter the site) after the wall base layer treatment is completed (solid, smooth, leak-proof, curing, leveling)
8. The paint (before the oilman enters the site) does not need to be booked and is available at any time
9. Order the floor (after the dirty work is completed) the floor needs to be booked in advance, it takes about a week

Installation stage
There are so many things to prepare above. Fortunately, the construction period is generally very long, and it is still within the controllable range. However, I still advise you to prepare early and make a list so that you wo n’t be in a hurry at any stage.
In the next installation stage, there are not many things to prepare, but they are also extremely important. such as:
1. Socket panel. The quantity and brand must be considered comprehensively, and there are a lot of fakes. No reservation required, available at any time
2. The remaining lamps. Can be prepared together with the socket, so that the master can install it at one time. No reservation required, available at any time
3. Mirror, faucet, kitchen hardware. As above, all can be done by a master
4. Curtain rod and drying rack. If you buy IKEA, you can get it yourself. No reservation required, available at any time
5. Toilet bowl and wash basin. No reservation required, available at any time (general physical stores buy and install packages)

Finished
1. Wasteland cleaning
There is a special wasteland cleaning company, which specializes in the maintenance of glass inside and outside windows, cracks in ceramic tiles, and maintenance of wooden floors, as well as specialized machines. There is no need to save this money. In the view of the second girl, it is actually necessary to clean it once a year
2. Distribution of furniture and home appliances
After completion, notify the merchant to deliver, these large items need to be inspected on the spot
3. Curtains, blinds
Generally need to book, blinds one week, curtains 3-8 days
4. Add soft pack slowly
Our home is always impossible in one step, and soft-packed things can be taken in and added slowly.
The order of house decoration and purchase order of home improvement building materials is like this. It can be said that it is very comprehensive. Whether it is dry goods, if there is wood, it is necessary to collect it.
What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount
1.Solar powered outdoor lighting with a maximum run time of 24 hours!
2.15W LED Lamp gives of a strong glow each night
3.Easy to install and requires no wiring, assembly or maintenance
4.Sets up in seconds and starts gathering power the moment its exposed to the sun
5.Over charge and discharge protection provide fail-safe mechanisms against faulty batteries
6.Has a lithium battery with an expected lifespan of 4-5 years
7. The powerful solar panels will absorb all the necessary energy during the day, for long time use at night. An over charge & discharge protection system ensures, your batteries are always protected from solar energy fluctuations. Will last for 24 hours
Solar Yard Lights,Solar Outdoor Lighting,Solar Lights For Garden,Solar Garden Lights
Yangzhou Beyond Solar Energy Co.,Ltd. , https://www.ckbsolar.com