Tianjin 200 million investment in heating, residents are no longer frozen this year

Tianjin 200 million investment in heating, residents will no longer be frozen 200 million investment in Tianjin this year, residents will no longer be affected by the heating sector this year, the Tianjin Beitang District heating department has a new network Mainline, as of September 6th, the construction department has started to move from Beitang Power Plant. The project is expected to be completed by the end of September this month. According to the person in charge of the site construction, the spheroidal ink for the project heating The cast iron pipe is a 1400mm pipe. The total length of the project is about 4.6 kilometers. The total investment should be about 200 million. From Beitang to the end of the project, it is divided into 6 sections. It is directly connected to the economic zone of Tianjin Beitang. And the leisure area of ​​Huanggang. Then it is on the auxiliary road south of the Jinjing trunk line. The project is expected to be completed at the end of this month. After the completion of the project, heating can begin this winter.

The article is reproduced in


Http://news.chinawj.com.cn Tianjin 200 million investment in heating, residents are no longer frozen this year Submission: 'Tianjin 200 million investment in heating, residents are no longer frozen this year

Y Type Flange Filter

Y Type Flange Filter,Y Type Filter Strainer,Flange Type Bag Filter Housing,Y Type Strainer Filter

Wenzhou KAIZHENG Valve Technology Co.,LTD. , https://www.kazevvalve.com