Teach you how to tiling

How to paste ceramic tiles? How to paste is considered standardized, Xiao Bian has a very detailed information, sent to share with everyone!

Kitchens and bathrooms should be covered with non-slip, non-soiling and easy to clean tiles. The paving work should be done after the waterproof treatment, floor heightening and solidification, ceiling, wall facade finishes and bath and cabinet installation. details as follows:


Dongpeng Tiles

(1) The vertical and horizontal reference lines should be ejected, requiring an angle of 90 degrees or 45 degrees with the door frame.

(2) Remove tiles that do not meet quality requirements, such as large color difference, cracks, missing corners, glazed damage, and warpage.

(3) For each row, vertical or vertical lines shall be used for vertical inspection. Horizontal straightness and surface flatness

(4) Non-full tiles should be laid outside the line of sight

(5) Pure cement can be used for laying cement slurry, and 1:2 fine yarn slurry can also be used. When the back of the brick is gray, it should be full and full, and it should be paved with a rubber hammer.

(6) When the cement has not been solidified after the laying of the floor tiles, protective measures must be taken. It should not be subjected to gravity to prevent misalignment.

Personnel: It usually requires 1-2 bricklayers.

Order: First put wall tiles, then paste tiles.

Time: A good bricklayer sticks 5-6 squares a day, otherwise it is difficult to guarantee quality. Especially in the case of windowsills where small diagonals are needed, it is time consuming.

1, paving color glazed tiles:

Treat grassroots → bullets → tile soaking wet → spread cement mortar → install standard block → paving bricks → sew → clean → curing.

2, paving ceramic mosaic tiles (mosaic) categories:

Deal with grassroots → elastic line, marking bar → paving cement mortar → paving → tapping → sprinkling, peeling paper → picking, filling, cleaning → cleaning.

Essentials for Construction of Ceramic Tiles

1. The concrete floor should cut the base layer, cut the hair to a depth of 5 to 10 mm, and cut the distance between the cuts to be about 30 mm. After that, clean the floating ash, mortar, and oil stains, and produce scattered water to sweep the ground.

2. Before the paving, a good line should be played. On the ground, a reference line at right angles to the doorway opening should be popped. The line should be started from the entrance to ensure that the entrance is a whole brick, and the non-complete brick is placed under the overcast or furniture. The vertical and horizontal positioning control lines appear.

3, before laying ceramic tiles, ceramic tiles should be soaked in the shade.

4. When laying, cement mortar should be fully applied on the back of the ceramic floor tile. At the same time, use a level ruler to check and correct and wipe the surface cement mortar.

5. After 2 to 3 hours of paving, use white cement to wipe the joints. Use cement mortar and sand=1:1 (volume ratio) cement mortar. The joints should be densely packed and smooth. Wipe the surface with cotton again.



Wall Construction Floor Tiles Cement Window Furniture Floor Tiles Kitchen Wall Tiles Kitchen Cabinets Doors Kitchen Cabinets Doors Bathrooms Bathrooms Bathrooms Bathroom Tiles Bathroom Tiles Bathroom Tiles Bathroom Tiles Kitchen Tiles

Insulated Glass

Insulated Glass,Double Pane Glass,Insulated Tempered Glass,Insulated Window Glass

Huaian Hongrui Glass Co.,Ltd , https://www.hongruiglass.com