Floor heating floor maintenance Raiders

Floor maintenance in geothermal environment should pay special attention to heating and moisturizing.

1, heating should be gradual

The first use of geothermal heating, the first three days to gradually warm up: the first day water temperature is 18 ° C, the next day is 25 ° C, the third day is 30 ° C, the fourth day can be raised to normal temperature, that is, water temperature 45 ° C, The surface temperature is 28 ° C ~ 30 ° C.

2, turn off the geothermal system, cooling should be gradual

Turn off the geothermal system step by step, and the cooling rate is too fast, which will affect the service life of the floor.

3. When the room is dry, please humidify

Floor emergency maintenance

1, the floor is soaked in water

After the floor is found to be soaked in water, the water source should be disconnected immediately to clean up the accumulated water. Immediately remove the baseboard and blisters, dry the water, stack the floor face to face in a ventilated place, and press it with heavy objects to slowly recover. If the floor is heavily watered, you will need to replace it with a new one.

2, there are stubborn stains on the floor

When stubborn stains appear, wipe with a mild detergent and then wipe with a wrung cotton swab. Do not use an organic solvent such as acid, alkaline solvent or gasoline. Use alcohol to clean.

3, the surface of the floor is scratched

If it is slightly scratched, use oil to maintain the floor to reduce scratches; if the scratch is more obvious, use the same color crayons or use the same color paint to repair.

4, insects

When the floor is found to be infected, the insect floor should be removed immediately, using citron powder or other insect repellent, but the best way is to replace the new floor.

3 Way Ball Valve

3 Way Ball Valve,Sanitary Clamp Ball Valve,Three Way Ball Valves,Stainless Steel Tri Clamp Ball Valve

WENZHOU FOREVER CLASSIC TECHNOLOGY CO.,LTD , https://www.fosicvalve.com