Many people do not understand the construction process of plasterboard ceilings. Today we can understand and learn through the following ceiling construction process and tips.
On the construction site, the construction team did not catch up with the large-scale ceiling project. Only a small master made a small-scale plasterboard ceiling above the aisle. Due to irregular room types in this area, there are requirements for the construction process. The master carefully explained the project to me and Xiao Qiu while working.
Next, let's first recognize some tools that need to be used during the construction of the ceiling:
The first step: pick the keel
A few days before the construction of the ceiling was started, the wooden keel must be painted with a fire retardant coating and allowed to dry after being dried.
When selecting the keel, be sure to pay attention to the integrity of the keel. The wood keel will withstand the weight of the gypsum board. The worker's master will need to carefully select the wood keel material. Generally, there are no quality defects such as chapped, corroded, insect frogs and dead knots. The specifications are 30 to 40 mm in cross section and 40 to 50 mm in width. Keel.
Ceiling mounting paint
Aluminum Scaffold is also called aluminum scaffold, scaffold tower. It`s best suited for construction and building maintenance applications
Good for high traffic areas where mobility and appearance are important, offered as towers, sections or individual components.
The components are connected with the riveting process, or welded process, which very is firm and safe.