For homes that are put into renovations, the acceptance of home improvement must be put on the agenda. Experts said that the quality of the renovation project has a direct impact on the quality of life in the home. Only the acceptance of customs at all stages can ensure a home where the residents feel at ease. Many consumers think that acceptance is just a matter of completion after renovation. In fact, acceptance requires a good three-phase pass to be able to do the entire process without worry.
Regel carpet    Lingjia Creative Workshop  Â
Basics
Acceptance of materials
Acceptance of materials: When signing a contract with a customer, the formal decoration company will sign a material declaration sheet at the same time, detailing the brands, specifications and quality grades of the required materials. Both parties shall check the materials according to the material specification.
The time of acceptance of the agreed materials: After the materials are purchased, the purchaser shall notify the other party to the contract to prepare for the acceptance of the materials, preferably when the materials enter the market. The agreed acceptance time is very necessary to avoid material entry, the other party does not have time to accept the material, affecting the construction progress.
The acceptance person stipulated in the contract must be on the scene: both the person in the home improvement industry and the consumer should take it seriously so as to avoid unnecessary troubles or disputes later.
The acceptance procedure shall be strict: the inspector shall conduct necessary inspections for each material agreement stipulated in the contract, such as brand, quality, specification and quantity.
The inspector specified in the contract shall sign the acceptance checklist: If the inspection result material is qualified, the inspector shall sign the material acceptance checklist. If the owner finds that the entry materials are inconsistent with the contractual requirements, he may refuse to sign the material acceptance form until he negotiates with the home improvement company for resolution.
Defense off
Key acceptance of hidden works
Circuit modification: When the circuit is checked, it must be noted whether the wire used is the designated brand and whether the wire is up to standard. When checking the circuit modification, check the closed condition of the socket. If the original socket has been displaced, moisture-proof and waterproof processing shall be performed at the displaced position. Also check that the circuit joints in the ceiling are also treated with waterproof tape.
Waterway reconstruction: The test of the waterway reform is mainly to suppress the pressure. The pressure during the pressure can not be less than 6kg, and the pressure can not be less than 15 minutes.
Waterproof: Generally, the room where the floor drain is installed should be waterproofed. The waterproofness not only affects the daily life of the owner, but also affects the interests of the neighbors downstairs.
The ultimate off
Completion acceptance
Meticulous
Acceptance of doors and windows: should pay attention to whether the doors and windows open properly, whether the doors and windows are closely bonded to the wall, whether the gap is appropriate, generally 0.5 cm is preferred.
Bricklayer acceptance: should pay attention to whether there is tilt on the ground; whether the gaps in the brick surface are regular and consistent; whether there are enough drainage slopes on the floors with floor drains such as toilets and balconies; whether the brick surface has broken and collapsed angles. Test whether there is an empty wall drum drum can hit the wall with a small hammer.
Paint acceptance: You can touch the wall with your hand and feel that the paint is smooth, soft, smooth and clean without particles. The wall should have no emptying, blistering, cracking, and no stains.
Acceptance of woodworking mainly depends on whether the structure is straight, whether the corners are accurate, whether the parquet is tight, whether arcs and roundness are smooth and smooth, whether the cabinet door switches are normal, and whether the ceiling corner lines are connected with lines and deformations.
Miscellaneous acceptance: In accordance with the provisions of the contract item, the project shall be audited item by item to check whether all the lamps and lanterns are properly illuminated, whether the project garbage has been completely removed, whether the sanitary fixtures and other installation products are installed accurately, and the toilets include water storage and flushing. Wash basin drainage is normal.
>>> 20 Figure 45 flat sun married transitional housing Dwellings can also be converted into luxury homes
Construction acceptance entrance decoration children's room decoration window home improvement paint socket home cabinet door home decoration home decoration home decoration home
Draining Rack,dish draining rack,kitchen dish draining rack,dish drainer rack,Dish Rack sink,etc. The materials used are 304 stainless steel, easy to clean, never rust!
China Kichen Rack,Sink Grid,Stainless Mesh Storage Baskets,Kitchen Wire Storage, we offered that you can trust. Welcome to do business with us.
Kichen Rack is made of high quality 304 stainless steel, This kind of material steel luxury, never rust, resist corruption, easily clean, safe, healthy and durable. Prevent rust or chemicals from contaminating food and damaging health
Fruit Vegetable Washing Draining Basket,Stainless Steel Kitchen Tool,Draining Rack, Draining Basket
Shenzhen Lanejoy Technology Co.,LTD , https://www.szlanejoy.com