Newcomers must read: knowledge of hydropower reform

living room:

1. 3 related cable TVs, TV cabinets, murals, power supply can be properly low

2. Phone, look at the cable backup power.

3. Put a socket on the two corners behind the sofa.

4. 4 mobile sockets

5. Whether the air-conditioning socket is suitable, the wall-selecting machine or the wall-mounted machine, the corresponding socket, the air conditioning hole

6. Hall lights, main lights, effect lights (light strips, etc.)

Master bedroom:

1, the main light switch, temporarily do not move.

2. Network calls (near the nightstands in the north, wiring, and sockets)

3. Add a socket after the two nightstands (consider it)

4. The location of the air conditioning socket should also be available, without considering changing

5. Two mobile sockets, placed on the open wall of the Western Wall, for use by occasional appliances, such as vacuum cleaners and electric irons.

The second bedroom is similar to the master bedroom

bathroom:

1. Yuba or exhaust fan

2. Mirror light, mirror light switch, mirror edge socket

Main lamp

4. Water heater socket

5. Washing machine socket

6. The phone is usually behind the toilet (this is a practical need, and there is very little change in drowning)

study:

1. After-desktop Internet phone, more than 2 related power supplies. It is recommended to place the socket on an unobtrusive desk

2. Cable TV can choose whether or not

3. Sofa corner power outlet, can be inserted floor lamp

Air conditioning socket

5. Main light

6. The network call center can be placed in the study and equipped with a power outlet

7. 1 to 2 motorized outlets

restaurant:

1. Dining lights, effect lights

2. Mobile socket

kitchen:

Exhaust hood

2. Kitchen Po socket,

3. Rice cookers, microwave ovens, juice extractors, refrigerators, gas water heaters, induction cookers and other sockets, better conditions but also add dishwashers, disinfection cabinets and other sockets

balcony:

Can add outlets, background music, Internet phone

Waterway reconstruction section:

Ready to work:

1. Complete the decoration at the property
2. Ask the property to coordinate the upstairs tenants who have not been renovated, and do the upstairs shelter experiment (to prevent the seepage of water upstairs, endanger the downstairs, and find problems early repair)
3, first own or your own designer put the kitchen and bathroom display, brand, location have a design of the overall program, set the outlet position.
4, if you decide the electric water heater, you need to set the brand and size.
The main reason for the change of water is to change the pipe under the Ming Dynasty, to save space for the sake of beauty, and to create a personalized water environment based on the population and water usage habits of each household.

Change the water to pay attention to the problem: left hot right cold to distinguish, after construction to suppress test.
What needs to be reminded is that some residential quarters are heavy and relatively heavy steel bearing walls and cannot be cut off by steel bars (affecting the quality of the house). If owners change their water, they may consider adding something later in the water period, and they need more water. Reserve one or two outlets. When you need to use it, install a faucet.

Remember that you must plan your overall layout before you start construction to avoid mistakes in communicating with construction personnel. Generally speaking, it is in accordance with conventional construction. There are special requirements that need to be clearly explained to the construction personnel in advance.

The single bathroom layout is: ceiling light, exhaust fan, mirror front light (optional, because the brightness of the ceiling light is enough, if the mirror needs to be installed to install the mirror light, but there is, if there is no dressing in the bedroom Taiwan, it is best to install the mirror headlights, it is recommended that the mirror headlights best choose energy-saving tube lights, brightness, energy saving, good cleaning.) Leave a spare outlet on the right side of the bathroom cabinet, why not leave the left side, because, most people are Is used to right-handed work, an analogy, such as hair, if the socket is installed on the left, then plug in, right hand hair dryer, the front will have a line of sight blocking the eyes and uncomfortable, etc., so it is recommended that the right side is preferred; The mirror headlight switch is also preferably left in a flush position for ease of use. The exhaust fan switch should not be moved if it is already present, so as not to increase the cost of retrofitting. If the original position is not reserved, it is preferably placed on the upper right or upper left of the seat. According to personal habits, do not forget to consider the water in the selected position, or better to install a waterproof cover, so as to avoid danger, and then consider with the mirror headlights together, so save the wiring Degree, the provincial reconstruction costs.

The complex bathroom layout is:

Installation of ceiling lights or spotlights; Combination of Yuba installation or separate installation of Yuba (also called integrated Yuba), as well as warm wind Yuba, switch recommended to install near the shower, easy to use, ready to control the temperature, select the switch With waterproof function, safe use, and then choose to install in the inside of the entrance, with the mirror headlights and socket mounted on a horizontal line, the switch is best not installed outside the door, the use is very inconvenient. If the bathroom is recommended to install a bathroom heater with a fan, do not install the ceiling light, and put the top light on the top is very chaotic, the installation switch on the inside of the door, the bathroom heater lighting to the outside, because the first light into the bathroom After entering the door, the lights are on, and people come. No ceiling light with Yuba, remember to install the mirror headlights, because the Yuba lighting is not enough brightness, such as: make-up, tickling beard, etc., all need brightness, and the most important point to install the bath to take power where to take, it is critical, not Less decorated teams and non-standard hydropower companies and hydropower construction teams will take power from the ceiling lamps. They are very, very non-standard, because they have to start with the distribution box. Now the distribution boxes of new buildings are more standardized, mainly divided into: Control, lighting all the way, all the way to an ordinary socket, all the way to the kitchen socket, all the way to the bathroom socket, and the air-conditioning special socket in several ways. The main control, lighting and air conditioning knife gates have no leakage protection function, and they all have leakage protection function. Saying this, it should be understood that the bathroom fighter can't use the power supply of the lamp. It is necessary to install the bathroom heater with current leakage protection because the humid air can conduct electricity. , Said that this, in the section, is the toilet's equipotential box, why would it speak of it? Didn’t that just say the bathroom was wet and the air was conducting? The equipotentiality is to solve these problems. The equipotential box will branch off several routes and connect it to the metal body of the bathroom. If the air in the bathroom is charged, the metal body will react immediately, pass it to the equipotential branch, and then pass it to the equipotential tank, etc. The structure in the potential box is: the iron row of the equipotential tank body is connected with the ground of the distribution box and the structural structure of the building.) Because the iron row is connected with the ground wire, the leakage protection switch in the distribution box is powered off to protect people's safety. When static electricity is generated in the bathroom, it is transmitted to the iron canopy in the equipotential tank via the branch line of the electric box. The iron row is connected with the structural structure of the building. The building structure will unload the electricity and the high-voltage static electricity will disappear, which will protect people's safety. Turn the foreword, and then say that the Yuba takes the power. After such an explanation, everyone should know how to pick it up. Remember that the Yuba must take the power of the bathroom outlet; Why does it take the power of the outlet and do not take the power of the lamp? Because the power of the lamp It is the all-in-one control loop of the whole room. The 2.5mm BV line, its own lamp circuit is only for lamps, small loads, and the addition of Yuba will increase the load of the line and affect the life of the line. A long time will have serious consequences.

Bathroom electric water heater installation, take the power must be 4mm BV line, this choice is relatively safe, one is: electric water heater power is relatively large, the need for large square line; Second is: the thicker the ground line, ease the leakage of equipment, the consumption of residual The more electricity, the safer it is. General electric water heater socket allows electric water heater manufacturers to locate, electric water heater manufacturers understand their own products, so that their design will be very reasonable (general formal manufacturers are free design). There is also a water heater that is instant water heater, this product has not been widely used by the public, so its many defects may not have been found through the running-in time, foreign use of this much, the import of possible technology is better, out It is preferable. Its lead wire has requirements, must be 4mm or 6mm BV special line, must install the brand leakage protection device of high sensitivity, the product position of the socket needs accurate position, some leave the socket outside the water heater on the line, must take the picture while reforming Or with the manufacturers to pay the bottom construction.

Consider installing a socket near the toilet seat, such as using a body cleaner, a small floor heater, and a power supply.

Some baths also need to use power, so that manufacturers can draw a power position or have a map.

Toilet speaker installation: It is best to install an adjustable switch so that it is easier to use.

Room solar installation: on the same day of hydropower reform, the solar energy plant will be brought to the site early in the morning and exchanged with the masters of the hydropower. The two parties decided on the reconstruction plan in written form before they could be constructed to avoid mistakes after the construction and to make mutual decisions. Whose fault is.

The installation of bathroom phones: generally placed on the edge of the toilet, not too high from the ground, set by the height of the person (people do turn back on the toilet, hand convenient to get the place is appropriate), if the frequency of answering the phone is not much, In fact, it is very convenient to buy a phone in the living room.

When the waterway is reformed, there are four points that should be noted for the installation of electric hot water heaters, sub-tap and other cold and hot water supply pipes.

1, to ensure that the spacing of 15 cm (now most of the electric water heaters, sub-faucet hot and cold water on the water spacing is 15 cm, there are individual 10 cm);

2. The height of the hot and cold water nozzles is the same;

3, cold, hot water supply pipe vertical wall surface, after the wall tile should also be careful not to let the bricklayer get it wrong (not vertical, then the installation can be strenuous);

4, cold, hot water on the nozzle should be higher than the wall two centimeters, shop walls should also be asked bricklayers finished after the completion of wall tiles to ensure the same level of wall tiles and water pipes. If the size is not appropriate, after installation of electric water heaters, sub-tap, etc., it may be necessary to purchase an additional pipe hoop, inner wire and other connectors to complete the installation;

Commonly used in the plumbing market is PPR pipe, aluminum plastic pipe, galvanized pipe and so on. The home remodeling waterway (water supply pipe) is best to use PPR pipe, because it is connected by heat welding, it will not leak water for life, and its service life can reach 50 years.

Hydroelectric Rehabilitation Socket Switch Electric Water Heater Lighting TV Renovation Living Room Living Room Mural Function Sofa Bed Cloth Sofa Kitchen Integrated Ceiling Mirror Front Light Kitchen Wall Tile Kitchen Cabinet Door Mural Floor Lamp Function Sofa Study Design Bathroom Door Bathroom Wall Tile Toilet Door Size Bathroom Size Toilet Row Air fan whole bathroom bathroom design bathroom waterproof small study bathroom leaking small bedroom balcony study bedroom lamp

Stainless Steel Products

Stainless steel is a corrosion resistant steel alloy with a minimum of 10% chromium. There are different grades and surface finishes of stainless steel produced to accommodate the environment in which the material will be implemented. Unlike carbon steel, stainless steel does not rust when exposed to air and moisture due to the sufficient amount of chromium present. The chromium creates an invisible passive film of chromium oxide that will not let oxygen attack the surface and prevents rusting of the iron base.

Yuhong Group is a stainless steel Manufactory of more than 24 grades of Stainless Steel.

Stainless Steel Pipe

Stainless Steel Pipe,Stainless Steel Seamless Pipe,Stainless Steel Welded Pipe

YUHONG GROUP CO.,LIMITED , http://www.alloypipeline.com